Glossary
66 terms that come up when hiring across our six sectors, defined in plain English. Regulations, standards and schemes are named exactly as they are published, so you can look them up. Where a term matters to a hire, the definition says why.
Aggregates and building materials
- Aggregates
- Granular materials used in construction: sand, gravel and crushed rock. Primary aggregates are quarried or dredged; secondary aggregates are by-products of other industries; recycled aggregates come from construction and demolition waste processed to a specification.
- Crushed rock
- Hard rock such as limestone, granite or gritstone that is blasted from a quarry face, then crushed and screened into graded sizes. A crushed rock site usually means blasting, fixed plant and a larger maintenance team than a sand and gravel pit.
- Marine-dredged aggregate
- Sand and gravel dredged from the seabed under licence and landed at wharves, where it is screened, washed and sold. Wharf sites hire for plant, processing, weighbridge and transport roles rather than for quarry face work.
- Crushing circuit
- The sequence of crushers and screens that reduces rock to product sizes: a primary crusher (usually a jaw) followed by secondary and tertiary stages (usually cone or impact crushers). A crusher operator runs the circuit, balancing throughput against product specification and wear.
- Screening
- Separating crushed or dug material into size fractions on vibrating screens fitted with meshes of set apertures. Screen performance decides whether a product meets its grading.
- Shotfiring
- Charging and firing explosives to break rock at a quarry face. Under regulation 25 of the Quarries Regulations 1999 the operator must make written rules for appointing shotfirers, trainee shotfirers and storekeepers, and regulation 26 requires a record of each appointment.
- Quarries Regulations 1999
- The main health and safety regulations for quarries in Great Britain (SI 1999/2024), supported by HSE’s Approved Code of Practice L118. They place duties on the quarry operator, including competence of everyone at the quarry (regulation 9), the management structure included.
- Health and safety document
- The document required by regulation 7 of the Quarries Regulations 1999 that sets out how the quarry’s hazards are identified and its risks assessed, and the measures and site rules that control them. Running and revising it is a core quarry manager duty.
- Geotechnical assessment
- An assessment of the stability and safety of an excavation or tip, carried out by a geotechnical specialist under Part VI of the Quarries Regulations 1999 (regulation 33). The operator must deliver any remedial work by the deadline the specialist sets.
- MPQC
- The Mineral Products Qualifications Council, a not-for-profit body for the extractive and mineral products sector that awards vocational qualifications and runs skills schemes. Its qualifications, from operator to management level, are a common way of evidencing competence on quarry and plant sites.
- Batching plant
- A plant that weighs and mixes cement, aggregates, water and admixtures to a specified recipe to produce ready-mixed concrete. A concrete plant manager runs production, quality testing and the truck mixer fleet that delivers it.
- Asphalt plant
- A coating plant that dries and heats aggregates and mixes them with bitumen to produce asphalt for road surfacing. Asphalt plant roles combine process control, burner and dryer maintenance, and quality testing.
- Weighbridge
- A platform scale that weighs loaded vehicles leaving a site. The weighbridge operator issues tickets, checks loads against orders and legal limits, and is often the first person a haulier speaks to.
- Restoration
- Returning a worked quarry to an agreed after-use, such as farmland, water or nature habitat, as required by its planning permission. Restoration obligations shape how a site is worked from the start.
Manufacturing
- Multi-skilled engineer
- A maintenance engineer competent in both mechanical and electrical work, so one person can diagnose and fix a breakdown without waiting for a second trade. On a 24-hour line it is usually the role that keeps a shift running.
- Planned preventive maintenance (PPM)
- Maintenance carried out on a schedule, by time or by run hours, to prevent failures rather than repair them. The balance between PPM and reactive work says a great deal about a site’s maintenance culture.
- OEE
- Overall equipment effectiveness: availability multiplied by performance multiplied by quality, as a percentage of a line’s theoretical maximum output. It is the measure most production and maintenance managers are judged on.
- Total productive maintenance (TPM)
- An approach in which operators take on routine care of their own equipment, such as cleaning, inspection and simple adjustments, so maintenance engineers can focus on planned and improvement work.
- Continuous improvement (CI)
- Ongoing, structured work to remove waste and variation from a process, often using lean tools such as 5S, value stream mapping and root cause analysis. CI engineers are hired to run it.
- Root cause analysis
- A structured method, such as 5 Whys or a fishbone diagram, for finding the underlying cause of a fault rather than its symptom, so it does not recur.
- Continental shift pattern
- A rotating pattern, commonly four days on and four days off across days and nights, used to staff a line around the clock. Shift pattern is one of the first things a maintenance candidate asks about.
- ISO 9001
- The international standard for quality management systems. Quality managers and engineers maintain the system, run internal audits and prepare for certification audits.
- FMCG
- Fast-moving consumer goods: products such as food, drink and household goods that are made in high volume and sold quickly. FMCG sites tend to run continuously with high line speeds and frequent changeovers.
- Building services (M&E)
- The mechanical and electrical systems that make a building work: heating, ventilation, air conditioning, power, lighting, water and controls. M&E engineers design, install or maintain them.
Automation and controls
- PLC
- Programmable logic controller: an industrial computer that reads inputs from sensors and switches, runs a control program and drives outputs such as motors and valves. Siemens and Rockwell (Allen-Bradley) platforms are the most commonly asked for in the UK.
- IEC 61131-3
- The international standard that defines the programming languages for PLCs, including ladder diagram, function block diagram, structured text and sequential function chart.
- SCADA
- Supervisory control and data acquisition: software that gathers data from PLCs and remote sites and lets operators monitor and control a whole plant or network from one place. Water, energy and process sites rely on it.
- HMI
- Human-machine interface: the screen an operator uses to see and control a machine or process. HMI design is often part of a controls engineer’s brief alongside the PLC code.
- DCS
- Distributed control system: a control architecture used on large continuous process plants, where control is spread across many controllers under one integrated system rather than separate PLCs.
- Functional safety
- The part of a system’s safety that depends on control systems working correctly, such as a trip that stops a machine. It is governed by standards including IEC 61508 and, for the process industries, IEC 61511.
- SIL
- Safety integrity level: a rating from 1 to 4 under IEC 61508 and IEC 61511 for how reliably a safety function must perform. Engineers who can specify and verify SIL-rated systems are a small pool.
- FAT and SAT
- Factory acceptance test and site acceptance test: the two formal checks a control system passes, first at the integrator’s works and then once installed. Commissioning engineers run them.
- Industrial network
- The communication network linking controllers, drives and instruments, using protocols such as PROFINET, EtherNet/IP and Modbus. Network faults are a growing share of controls call-outs.
- BS 7671
- The IET Wiring Regulations, the UK standard for electrical installations, currently the 18th Edition (BS 7671:2018) with its amendments. Controls and electrical engineers are usually expected to hold the current edition and amendment.
Industrial engineering
- Reliability engineering
- Engineering focused on making equipment fail less often and recover faster, using failure data, condition monitoring and maintenance strategy. Reliability engineers are hired to move a site from reactive to planned maintenance.
- Condition monitoring
- Measuring the health of running equipment, through vibration analysis, thermography, oil analysis or ultrasound, to find faults before they cause a breakdown.
- CMMS
- Computerised maintenance management system: software that schedules maintenance, records work orders and holds asset history. SAP PM and similar systems are common on larger sites.
- Shutdown or turnaround
- A planned period when a plant is stopped for major inspection, maintenance and upgrades. Shutdowns need planners and large numbers of contract trades for a short, fixed window.
- Permit to work
- A formal written system that controls high-risk work, such as hot work or entry into confined spaces, by setting out the hazards, the isolations and who has authorised the work.
- Lock out, tag out (LOTO)
- Isolating and locking off energy sources before work on equipment, with a tag identifying who holds the lock, so a machine cannot be started while someone is working on it.
- COMAH
- The Control of Major Accident Hazards Regulations 2015, which apply to sites holding dangerous substances above set thresholds, in lower and upper tiers. COMAH sites expect process safety competence from engineers.
- DSEAR
- The Dangerous Substances and Explosive Atmospheres Regulations 2002, which require risks from flammable and explosive substances to be assessed and controlled. Electrical work in hazardous areas commonly calls for CompEx certification.
- PUWER
- The Provision and Use of Work Equipment Regulations 1998, which require work equipment to be suitable, maintained and used safely. Maintenance managers carry much of the day-to-day duty.
- LOLER
- The Lifting Operations and Lifting Equipment Regulations 1998, which govern lifting equipment and require thorough examination at set intervals.
- MTBF
- Mean time between failures: the average running time between breakdowns of an asset, and one of the main measures of reliability improvement.
Civil engineering
- CDM 2015
- The Construction (Design and Management) Regulations 2015, which set health and safety duties on construction projects for the client, principal designer, principal contractor, designers and contractors. A site agent normally works within the principal contractor’s duties.
- Temporary works
- Structures needed to build the permanent works, such as excavation support, falsework and formwork, and crane bases. BS 5975 is the code of practice for managing them.
- Temporary works coordinator (TWC)
- The person appointed under BS 5975 to manage temporary works on a project: the design brief, checks and permits to load and to strike. Experienced TWCs are consistently scarce.
- Setting out
- Marking the exact position and level of the works on the ground from the design, using total stations and GPS. A setting-out error is poured into the ground and stays there, which is why it is checked so hard at interview.
- NEC4
- The current edition of the New Engineering Contract family, widely used on UK infrastructure. Its compensation event and early warning processes shape the commercial side of a civils role.
- Compensation event
- Under an NEC contract, an event, such as a change to the works or unforeseen ground conditions, that may entitle the contractor to more time or money. Quantity surveyors manage the process.
- NRSWA
- The New Roads and Street Works Act 1991, which governs works in the public highway. Supervisors and operatives working in the road need NRSWA street works qualifications.
- SMSTS
- The Site Management Safety Training Scheme run by CITB, the standard safety course for site managers and agents. SSSTS is the equivalent for supervisors.
- CSCS card
- Construction Skills Certification Scheme card, the common proof that a worker has the training and qualifications for their job on a UK construction site.
- Section 278 and section 38 agreements
- Agreements under the Highways Act 1980. A section 278 agreement lets a developer carry out works on an existing public highway; a section 38 agreement covers new roads built to be adopted by the highway authority.
- Development Consent Order (DCO)
- The consent required under the Planning Act 2008 for a nationally significant infrastructure project, such as a major road or power station, granted by the relevant Secretary of State.
Renewable engineering
- GWO training
- Training to the standards of the Global Wind Organisation, starting with Basic Safety Training (first aid, manual handling, fire awareness, working at height and, offshore, sea survival). Wind technicians need current GWO modules to get on site.
- Operations and maintenance (O&M)
- The phase after construction in which an asset is run, serviced and repaired for its working life. O&M teams hire steadily rather than in construction peaks.
- BESS
- Battery energy storage system: batteries, inverters and controls that store electricity and release it to the grid. BESS projects need HV, commissioning and controls engineers.
- Grid connection
- The physical and contractual link between a generation or storage site and the electricity network, through a distribution network operator (DNO) or the transmission system. Connection dates often decide a project’s programme.
- G99
- Engineering Recommendation G99, the requirements for connecting generation to a distribution network in Great Britain, including protection settings and testing.
- High voltage (HV)
- In UK practice, electrical systems above 1,000 volts AC. HV competence is the most common scarce skill across renewables, grid and storage hiring.
- Contracts for Difference (CfD)
- The UK government’s main scheme for supporting new low-carbon generation, awarding projects a guaranteed strike price through allocation rounds. A CfD award is often what turns a pipeline project into a hiring plan.
- Commissioning
- Testing and proving that a newly built system works as designed before handover, from individual equipment to energisation of the whole site.
- Solar PV
- Photovoltaic panels that turn sunlight directly into electricity, with inverters converting it to AC for the grid. Utility-scale PV hires design, construction and grid engineers.
Hiring for one of these roles?
Every sector has its own salary table, role pages and hiring guides. Or send us the brief and we will tell you what the market looks like for it.